${spinon.layout.jumpToContent}

Salzgitter

Renewal of Engeroder Straße between the junctions with Rheinstraße and Am Ziesberg in SZ-Bad

The Civil Engineering and Traffic Department will be carrying out roadworks on Engeroder Straße in SZ-Bad between the junctions with Rheinstraße and Am Ziesberg from Monday, 30.06.2025.

(Microsoft Word - 2024_02_02 General plan)

During the road construction work, the carriageway, bus stops, footpaths and parking areas will be completely renewed. Construction is scheduled to last until around the end of the year.

Engeroder Straße must be fully closed to vehicle traffic between the junctions with Rheinstraße and Am Ziesberg for the construction work. A detour will be signposted.

Bus routes 611, 615 and 618 affected by the construction work will also be diverted. Lines 611, 615 and 618 will have to travel in both directions via Nord-Süd-Straße during the construction work. The "Engeroder Straße" and "Ziesberg" stops will be closed. Passengers on lines 611 and 618 will have to divert to the "Elbestraße" stop. Line 615 will serve the "Feuerwache" stop (line 610). For the stops "Engeroder Straße" and "Ziesberg", the stops "Rheinstraße" and "Porschestraße" (line 610) will be served.

Traffic obstructions are to be expected.

Explanations and notes

Picture credits

  • City of Salzgitter